www.nautcon.com
    Cost Estimation
Dispute Resolution
CPM Scheduling
Litigation Support
Surety Consulting
Cost Estimating
Demonstrative Evidence
About Us
   
 
It is well documented within the construction industry that poor cost estimating and scheduling are two of the root causes of project failure. The interrelationship between time and money is always of major importance to both the owner and contractor. Nautilus specializes in construction and engineering cost estimating. Our cost estimates provide our clients with detailed quantity takeoffs and pricing from the conception phase through project closeout.

With its team of Certified Cost Engineers and Consultants, Nautilus is equipped to prepare estimates and/or verify proposed construction costs at various stages throughout the construction process. This enables us to assists our clients in the following areas:

 
 
Conceptual Project Budgets
 
Construction Bid Estimates
 
Contract Cost Review
 
Value Engineering Cost Estimates
 
Life Cycle Costing
 
Change Order Evaluations
 
Project Closeout Costs
 
Claims Pricing and Evaluation
 

During the construction period, Nautilus can interface with the project team on change order negotiations and management. This can be of particular value to an owner in that Nautilus can provide independent verification that the costs being proposed by the contractor or its subcontractors are reasonable, as well as confirm that the intended scope of the change order is complete and meets our clients' expectations.

The timely negotiation and resolution of change orders, both with regard to time and money, is one of the best and most cost effective ways of ensuring that you minimize your chance of related claims down the road. Let Nautilus help you ensure that you have done everything possible to protect your interests and achieve project success.



 
Construction Consultants & Project Planners
© Nautilus Consulting, LLC